ALLEN CO., Ind. (ADAMS) – The Indiana Department of Transportation has announced rolling slowdowns scheduled for S.R. 3/Lima Road on Tuesday.
Two rolling slowdowns will take place in both the north and southbound lanes of S.R. 3/Lima Road. The slowdowns are happening so crews can install new traffic signals at the intersection of S.R. 3 and Till Road.
During the rolling slowdowns, traffic should follow the direction of law enforcement officers and be prepared to stop. Each rolling slowdown will last no longer than 20 minutes.
The work is scheduled to take place on October 5 from 9 a.m. to 12 p.m., weather permitting.